History
[ Aims ]   [ Structure ]   [ Organisations ]   [ Partner Churches ]   [ History ]  

This page is about the history of our church.



Contents

Our Former Ministers
Our Buildings' Story 1844-1899
Our Buildings' Story 1900-1949
Our Buildings' Story 1950-




Our Former Ministers

1846-1849        William Crease
1850-1864        Samuel Ellis
1866-1878        Watson Smith
1880-1887        Stuart Reid
1889-1902        J. Brunton Aitken
1904-1920        Horace W. Turner
1920-1936        Lewis H. Gaunt
1936-1942        Harold G. Newsham
1943-1948        Walter C. Lazenby
1949-1960        C. Anthony Neeve
1961-1968        J. Ian Y. Sharpe
1969-1974        Robert W. Courtney
1974-1993        Frederick A. Noden
1994–1998        Stuart A. Bidmead
1998-1999        John Houston
1999-2006        David Jenkins

Top


Our Buildings' Story 1844-1899

1844

William Crease, a 34 year old Scot from Stirling, trained for the ministry of the United Presbyterian Church in Scotland, comes to Wilmslow on the recommendation of Rev. J.W. Massie of Salford. He stays with a local schoolmaster Thomas Somerville. The Band Room in Grove Street is hired. The initial congregation is four – Thomas Somerville and his wife and a local farmer John Bentley and his wife.

1845

William Crease is ordained to the Congregational Ministry. Thomas Somerville starts a Sunday School.

1846

John Jenkins, the 27 year old Lord of the Manor of Fulshaw, donates a portion of land at the junction of the Turnpike Road to Congleton and the lane to Mobberley for the use of the church. In June the foundation stone of the church is laid.

1848

The church, to be known as Fulshaw Chapel, is opened, a rectangular building in thirteenth century Gothic style.

1854

A Day School is established.

1858

The Large Hall is built to hold the Day School. There is a partition in the centre to separate boys from girls. The Infants' Department meets in the rooms beneath the church.

1863

The church is enlarged with an apse and transepts to the North and South, complete with galleries.

1869

A new building to house the Cause at Morley Green is opened.

1873

A garden with a quickset hedge is laid out. A porch is built on the church.

1876

A pipe organ is bought to replace the harmonium.

1883

The Junior Hall is built and the building at Morley Green is enlarged.

1891

The Day School becomes a Higher Grade School

1899

An evening school is established to extend the work in the direction of technical studies.

Top

Our Buildings' Story 1900-1949

1905

The church is to be known as Wilmslow Congregational Church

1909

The Day School closes and the children transfer to the village school.

1912

Alterations to the halls and the area under the church are opened.

1921

A memorial to the ten men of the church who did not return from the World War is unveiled.

1923

A new organ is purchased.

1944

New conditions are agreed for the "Members of Wilmslow Congregational Church worshipping at Morley Green".

1949

A memorial to the six men of the church who lost their lives in World War II is unveiled. A lamp, modelled on the Octagon Tower of Ely Cathedral is suspended above the Communion Table.



Top

Our Buildings' Story 1950-

1961

The old kitchen and other rooms are demolished, and two large classrooms, a new kitchen, and toilets are built.

1963

A new system of lighting is installed in the church and a Cross is erected in the apse as a focus for worship.

1968

A set of stained glass windows representing the Cross , wheat and the vine are dedicated in memory of Mr. H.H.Catterall.

1972

The congregation at Morley becomes an independent church. The United Reformed Church is formed by Act of Parliament and both churches become members of it.

1976

A fire breaks out in the basement. The church is closed for redecoration and refurbishment.

1981

A new vestibule is built on the Alderley Road frontage of the church. The side gallery is re-raked.

1986

A computer organ is purchased and the space previously occupied by the old organ converted to provide more pews.

1999

A new vestibule is added to the halls, and the kitchen and toilets are upgraded. New lighting is installed in the church.

2000

The two main halls are re-roofed and linked by two sets of double doors.

2005

Major refurbishment. Pews are replaced by chairs, dais redesigned, heating replaced and sanctuary redecorated. Small kitchen and servery and disabled toilet installed in vestibule.